through the closing into a Code Block; move the font tags and tags into Settings > Advanced > Code Injection (header) [ ] Route through internal review before publishing externally -->
Design + Permits · Maricopa County

Know what you can build before you buy.

Etch Designs runs parcel analysis, architectural design, and permit submission as one process — so developers, flippers, and realtors move on Maricopa County properties with the buildable math already done.

// parcel data · zoning envelope · equity math · permit-ready plans

PLAT · R1-6  SAMPLE PARCEL APN 000-00-000
85'-0" 130'-0" BUILDABLE ENVELOPE 20' FRONT 15' REAR
18,050 SF buildable
Filing in: PhoenixMesaScottsdaleTempe ChandlerGilbertGlendaleMaricopa County
Who we work with

One team, three ways to use it.

Developers

De-risk the entitlement.

Buildable-envelope and zoning analysis before you close, then design and permit packages built for how Maricopa County jurisdictions actually review — fewer redlines, fewer resubmittal cycles.

Run a parcel →
Flippers

Speed to permit is margin.

Remodel and addition plans turned around fast, with the permit path scoped up front so your hold time — and your carry cost — stays predictable.

Scope a project →
Realtors

Answer "what can they build?"

Send us a listing. We return a Buildable Report your buyer or seller can act on — lot potential, ADU feasibility, expansion headroom. You look like the agent with answers.

Send a listing →
How it works

From parcel to permit, drafted in the open.

No black box. Every project runs the same sequence, and you can see where yours sits at any point.

STEP 01

Parcel analysis

We pull the parcel, zoning, and setback data and model the buildable envelope — before design money is spent.

DAYS 1–3
STEP 02

Scope & fixed quote

Design scope, permit path, and jurisdiction requirements defined up front. One quote, no drift.

WEEK 1
STEP 03

Design & engineering

Architectural plans coordinated with structural engineering, drawn to the reviewing jurisdiction's checklist from day one.

WEEKS 1–3
STEP 04

Permit submission & redlines

We file, track, and answer reviewer comments directly — you're not the middleman between an architect and a plan reviewer.

JURISDICTION CLOCK
STEP 05

Permit in hand

Stamped, approved, ready to build. We stay available through inspections if questions come back.

DONE
Free · No commitment

The Buildable Report.

Give us an address. We return a one-page read on what the parcel will actually support — the same analysis we run before every design engagement.

  • Zoning designation and setback requirements
  • Estimated buildable envelope, in square feet
  • ADU / addition feasibility flags
  • The permit path, mapped to the reviewing jurisdiction
Reviewed by a designer, not a bot
Request a Buildable Report

// typical turnaround: 2 business days

Etch Designs · Maricopa County, AZ

Bring us the parcel.
We'll bring the plan.