Know what you can build before you buy.
Etch Designs runs parcel analysis, architectural design, and permit submission as one process — so developers, flippers, and realtors move on Maricopa County properties with the buildable math already done.
// parcel data · zoning envelope · equity math · permit-ready plans
One team, three ways to use it.
De-risk the entitlement.
Buildable-envelope and zoning analysis before you close, then design and permit packages built for how Maricopa County jurisdictions actually review — fewer redlines, fewer resubmittal cycles.
Run a parcel →Speed to permit is margin.
Remodel and addition plans turned around fast, with the permit path scoped up front so your hold time — and your carry cost — stays predictable.
Scope a project →Answer "what can they build?"
Send us a listing. We return a Buildable Report your buyer or seller can act on — lot potential, ADU feasibility, expansion headroom. You look like the agent with answers.
Send a listing →From parcel to permit, drafted in the open.
No black box. Every project runs the same sequence, and you can see where yours sits at any point.
Parcel analysis
We pull the parcel, zoning, and setback data and model the buildable envelope — before design money is spent.
Scope & fixed quote
Design scope, permit path, and jurisdiction requirements defined up front. One quote, no drift.
Design & engineering
Architectural plans coordinated with structural engineering, drawn to the reviewing jurisdiction's checklist from day one.
Permit submission & redlines
We file, track, and answer reviewer comments directly — you're not the middleman between an architect and a plan reviewer.
Permit in hand
Stamped, approved, ready to build. We stay available through inspections if questions come back.
The Buildable Report.
Give us an address. We return a one-page read on what the parcel will actually support — the same analysis we run before every design engagement.
- Zoning designation and setback requirements
- Estimated buildable envelope, in square feet
- ADU / addition feasibility flags
- The permit path, mapped to the reviewing jurisdiction
// typical turnaround: 2 business days